The threshold for embedded generation plants increased to 100MW Private businesses can now generate energy to…
Search Results for: electricity infrastructure
Natural Gas Versus Renewable Energy
Over the week, a poll was conducted on The Electricity Hub’s social media page to access…
SOUTH AFRICA: South Africa to Allow Private Generation
South Africa to allow private generation of electricity Up to 100MW approved for private investors The…
Group Urges G7 Leaders to End Oil and Gas Financing in 2021
The economists believe that G7 countries should end oil and gas financing as they end coal…
The Beginning of the End
The Nigeria Electricity Supply Industry (NESI) is plagued with challenges. A lot of these challenges are,…
SOUTH AFRICA: Eskom Begins Stage 4 Load Shedding
Eskom announces stage 4 load shedding Had earlier on Wednesday began stage 2 load shedding Eskom…
LIBERIA: LERC Expresses Disappointment at Load Shedding Timetable
The Liberia Electricity Regulatory Commission (LERC) has expressed disappointment on the planned load shedding schedule announced…
NIGERIA: Nigeria Not Doing Enough to End System Collapses – Prof. Iledare
Nigeria not doing enough to prevent system collapses Decentralisation of the national grid, the way out…
Solar, Wind Make Up 93.8% of New U.S. Generation Capacity for Q1 2021
Wind and solar resources provided 93.84% of new generating capacity added in the US in the…
SOUTH AFRICA: Load Shedding May Reach Stage 5 – Energy Expert
South Africa may experience stage 5 load shedding Eskom faces huge infrastructure challenges No end in…